API src

Heat stress response of adult Saccharina latissima sporophytes to gametophyte priming: growth and Fv/Fm

Description: We assessed the heat tolerance of adult Saccharina latissima sporophytes reared in mariculture under heat stress and in response to gametophyte priming. Primed (0°C, 10°C, 20°C; 3 weeks) gametophytes (Lofoten 2023; 10°C mixed culture; n = 5) were sown on ropes and reared in a mariculture experiment (2 months hatchery, 4 months mariculture). Adult sporophytes were sampled and exposed to a 14-day heat stress treatment at 20°C, 21.5°C, 23°C with a 10°C control group. We measured growth (length and blade area) and Fv/Fm. The mariculture experiment took place at the hatchery of Polaralge AS (Sandhornøy, Norway; December - February 2024) and the deployment site of Lofoten Blue Harvest (Lilje Engla, Lofoten, Norway; 68°16'02.8"N 15°06'14.8"E; February – June 2024). The laboratory experiment was carried out at the Alfred Wegener Institute in Bremerhaven, Germany.

Global identifier:

Doi(
    "10.1594/PANGAEA.996550",
)

Types:
DataMeasurements(
    DataMeasurements {
        domain: Unspecified,
        station: None,
        measured_variables: [
            "Blade area",
            "Blade length",
            "Date",
            "Day of experiment",
            "Event label",
            "Maximum quantum yield of photosystem II",
            "Replicate",
            "Sample ID",
            "Treatment: temperature",
            "Type of study",
        ],
        methods: [
            "Image analysis NIH ImageJ",
            "Pulse-Amplitude-Modulated (PAM) fluorometer, WALZ GmbH, Germany, M-Series",
        ],
    },
)

Tags: Deutschland ? Temperatur ? Marikultur ? Hitzewelle ? Hitzebelastung ? Studie ? Laborversuch ? Kelp ? thermal priming ? thermal tolerance ?

Bounding boxes: 8.58052° .. 8.58052° x 53.53327° .. 53.53327°

License: Creative Commons Namensnennung 4.0

Language: Englisch/English

Organisations

Persons

Issued: 2026-10-22

Modified: 2026-10-22

Last harvest: 23.10.2026 02:45

Time ranges: 2024-06-24 - 2024-07-08

Resources

Status

Quality score

Accessed 2 times.