Description: Das Projekt "Energieforschung (e!MISSION), ABS4TSO: Advanced Balancing Services for Transmission System Operators" wird/wurde gefördert durch: Österreichische Forschungsförderungsgesellschaft mbH (FFG). Es wird/wurde ausgeführt durch: Austrian Power Grid AG (APG).Starting point: The extraordinary increase of renewable generation units in Europe connected to the transmission and distribution grid via inverter systems highly impacts the dynamic behaviour of the energy system. In contrast to conventional synchronous machines, which dampen frequency deviations due to their inherent inertia, such inverter-connected generation units, like wind and photovoltaics, act inertia-free and therefore do not support frequency stability. Hence, the future need for system services providing highly dynamic reactions to compensate these effects needs to be assessed. This includes a detailed analysis of the expected system parameters, possible implementation requirements and specific limitations of the analysed technologies and system services. As the current regulatory framework foresees those types of system services only partially this aspect has to be investigated, as well. Project objectives: Within the scope of this project, the characteristics of highly dynamic system services, supporting future system stability and security shall be analysed. Based on an estimation of future system needs an appropriate general framework as well as conditions for provision of specific services are examined. Special focus is given to a technology-neutral design of such system services. The following applications are examined: - Frequency stabilisation via synthetic inertia - Enhanced frequency response - Attenuation of system oscillations - Fast post fault active power recovery - Reduction of deterministic frequency deviations - Frequency stabilisation according defence plan - Frequency stabilisation in case of system restauration. Due to their characteristics, battery storage systems are optimally suitable to provide these system services. Additionally they can provide the necessary mobility and scalability within this project. Therefore within the scope of this project a battery storage system (approx. 1MW/500 kWh) will be installed as a reference implementation in order to assess the defined applications and services. (abridged text)
SupportProgram
Origin: /Bund/UBA/UFORDAT
Tags: Batteriespeicher ? Photovoltaik ? Windenergie ? Wind ? Stromnetz ? Batterie ? Energierückgewinnung ? Energieträger ? Erneuerbare Energie ? Gewährleistung ? Wärmekraftwerk ? Energieinfrastruktur ? Netzintegration ? Lastmanagement ? Energiesystem ? Energietechnik ? Technik ? Europa ? Anteil erneuerbarer Energien ? Energie ? Energieplanung ? Umwelt ? Technische Aspekte ? Transmission ? Energiespeicherung ? Enhanced Frequency Response ? Einwendung ? Hochdynamische Systemdienstleistungen ? Netz ? Netzplantechnik ? Power System Stabilizer ? Speichersysteme ? Synthetic Inertia ? Zuverlässigkeit ? Fast Post Fault Active Power Recovery ? Frequenzstabilität ?
License: cc-by-nc-nd/4.0
Language: Englisch/English
Time ranges: 2018-05-01 - 2021-04-30
Accessed 1 times.