API src

Found 11 results.

Other language confidence: 0.9274097776092763

ENSEDD

This research campaign was carried out on vessel / platform: unknown. Information on the campaign: Situation of heavy metals in the Schwarzen Elster. The campaign was carried out in the context of the following project(s): ELBE-2000

DROPS_ELBE_UNDEFINED

This research campaign was carried out on vessel / platform: several, not specified. Information on the campaign: A collection of campaigns carried out for the DROPS_ELBE project without specific information provided.. The campaign was carried out in the context of the following project(s): DROPS_ELBE

EUFERFIL

This research campaign was carried out on vessel / platform: unknown. Information on the campaign: Bank filtration. The campaign was carried out in the context of the following project(s): ELBE-2000

VALDIVIA56

This research campaign was carried out on vessel / platform: RV Valdivia. Information on the campaign: https://www.tib.eu/de/suchen/id/awi%3Adoi~10.2312%252Fvaldivia.1987/. The campaign was carried out in the context of the following project(s): DROPS_ELBE

VALDIVIA46

This research campaign was carried out on vessel / platform: RV Valdivia. Information on the campaign: https://www.tib.eu/de/suchen/id/awi%3Adoi~10.2312%252Fvaldivia.1986/. The campaign was carried out in the context of the following project(s): DROPS_ELBE

VALDIVIA64

This research campaign was carried out on vessel / platform: RV Valdivia. Information on the campaign: https://www.tib.eu/de/suchen/id/awi%3Adoi~10.2312%252Fvaldivia.1987/. The campaign was carried out in the context of the following project(s): DROPS_ELBE

EVERFTK

This research campaign was carried out on vessel / platform: unknown. Information on the campaign: Procedural parameters. The campaign was carried out in the context of the following project(s): ELBE-2000

EWWTWR

This research campaign was carried out on vessel / platform: unknown. Information on the campaign: Substance groups relevant for preparation (Elbe). The campaign was carried out in the context of the following project(s): ELBE-2000

ENWWTWR

This research campaign was carried out on vessel / platform: unknown. Information on the campaign: Substance groups relevant for preparation (Havel, Saale). The campaign was carried out in the context of the following project(s): ELBE-2000

ENSTSM

This research campaign was carried out on vessel / platform: unknown. Information on the campaign: Study of contaminants in the Saale dams. The campaign was carried out in the context of the following project(s): ELBE-2000

1 2