API src

Found 25 results.

Model Output Statistics for HEL (12135)

DWD’s fully automatic MOSMIX product optimizes and interprets the forecast calculations of the NWP models ICON (DWD) and IFS (ECMWF), combines these and calculates statistically optimized weather forecasts in terms of point forecasts (PFCs). Thus, statistically corrected, updated forecasts for the next ten days are calculated for about 5400 locations around the world. Most forecasting locations are spread over Germany and Europe. MOSMIX forecasts (PFCs) include nearly all common meteorological parameters measured by weather stations. For further information please refer to: [in German: https://www.dwd.de/DE/leistungen/met_verfahren_mosmix/met_verfahren_mosmix.html ] [in English: https://www.dwd.de/EN/ourservices/met_application_mosmix/met_application_mosmix.html ]

Nordsee-Monitoring: Nordsee-Monitoringfahrt 2011/08, CE1110B CE1110B (HELGO, 54.2498 N, 8.1017 E, 2011-09-04 05:55:00)

Marine chemical, physical and biological investigations at HELGO, 54.2498 N, 8.1017 E (2011-09-04) during the Monitoring Cruise 2011/08, CE1110B CE1110B of IOW as part of the monitoring program of the North Sea.

Nordsee-Monitoring: Nordsee-Monitoringfahrt 2011/10, CE1116 CE1116 (HELGO, 54.2465 N, 8.0977 E, 2011-11-01 15:10:00)

Marine chemical, physical and biological investigations at HELGO, 54.2465 N, 8.0977 E (2011-11-01) during the Monitoring Cruise 2011/10, CE1116 CE1116 of IOW as part of the monitoring program of the North Sea.

Nordsee-Monitoring: Nordsee-Monitoringfahrt 2011/05, Atair 190 Atair 190 (HELGO, 54.2490 N, 8.1000 E, 2011-05-25 11:56:00)

Marine chemical, physical and biological investigations at HELGO, 54.2490 N, 8.1000 E (2011-05-25) during the Monitoring Cruise 2011/05, Atair 190 Atair 190 of IOW as part of the monitoring program of the North Sea.

Nordsee-Monitoring: Nordsee-Monitoringfahrt 2011/03, CE1104 CE1104 (HELGO, 54.2513 N, 8.0987 E, 2011-03-17 07:02:00)

Marine chemical, physical and biological investigations at HELGO, 54.2513 N, 8.0987 E (2011-03-17) during the Monitoring Cruise 2011/03, CE1104 CE1104 of IOW as part of the monitoring program of the North Sea.

Nordsee-Monitoring: Nordsee-Monitoringfahrt 2011/01, CE1102 CE1102 (HELGO, 54.2497 N, 8.0997 E, 2011-01-19 07:02:00)

Marine chemical, physical and biological investigations at HELGO, 54.2497 N, 8.0997 E (2011-01-19) during the Monitoring Cruise 2011/01, CE1102 CE1102 of IOW as part of the monitoring program of the North Sea.

Nordsee-Monitoring: Nordsee-Monitoringfahrt 2010/11, CE1017 CE1017 (HELGO, 54.2470 N, 8.1003 E, 2010-11-02 21:22:06)

Marine chemical, physical and biological investigations at HELGO, 54.2470 N, 8.1003 E (2010-11-02) during the Monitoring Cruise 2010/11, CE1017 CE1017 of IOW as part of the monitoring program of the North Sea.

Nordsee-Monitoring: Nordsee-Monitoringfahrt 2010/05, Atair 180 Atair 180 (HELGO, 54.2487 N, 8.1000 E, 2010-05-19 15:47:00)

Marine chemical, physical and biological investigations at HELGO, 54.2487 N, 8.1000 E (2010-05-19) during the Monitoring Cruise 2010/05, Atair 180 Atair 180 of IOW as part of the monitoring program of the North Sea.

Bewertung und Begleitung der hessischen Umweltschutzmassnahmen in der Landwirtschaft (HEKUL und HELP)

Nach Artikel 16 Absatz 1 der Verordnung (EG) Nr.746/96 vom 24, April 1996 zur Durchfuehrung der Verordnung (EWG) Nr. 2078/92 des Rates fuer umweltgerechte und den natuerlichen Lebensraum schuetzende landwirtschaftliche Produktionsverfahren sorgen die EG-Mitgliedsstaaten fuer die Begleitung und Bewertung der Umweltschutzmassnahmen in der Landwirtschaft. Im Falle Deutschlands faellt dies in die Zustaendigkeit der Bundeslaender und das Land Hessen hat das IfLS mit der Untersuchung beauftragt. In der Untersuchung werden die hessischen Umweltschutzmassnahmen in der Landwirtschaft (das Hessische Kulturlandschaftsprogramm, HEKUL und das Hessische Landschaftspflegeprogramm, HELP) entsprechend ihren Zielen bewertet. Die Ziele betreffen soziooekonomische, landwirtschaftliche und umweltpolitische Aspekte, wobei aber bei der Bewertung ein besonderes Augenmerk auf die Evaluierung der Umweltwirkungen gelegt werden soll.

Rekultivierung der Deponie Neuenburg (Betriebsabschnitt I) - Das Standortsgutachten

Das Vorhaben hat zum Ziel, die vorhandene Abdeckung der Deponie im Hinblick auf ihre Eignung als Standort fuer einen wichtigen Waldbestand zu untersuchen. Es werden hierzu geeignete Parameter wie Substrataufbau, Wuchsigkeit der vorhandenen Vegetation usw. untersucht. Mit dem Programm HELP (Hydraulic Evaluation of Landfill Performance) wird der Wasserhaushalt der Abdeckschichten modelliert, um Aussagen ueber die Sickerwassermenge machen zu koennen. In einer zweiten Phase werden Verbesserungsmoeglichkeiten aufgezeigt und Plaene zur Reliefgestaltung, Bepflanzung und Gehoelzpflege entwickelt. Das Projekt soll die Bearbeitung einer Rekultivierungsplanung beispielhaft realisieren.

1 2 3